![]() |
|||||||||||
|
|
|||||||||||
![]()
|
Sprinkling Systems Complete the Installation Permit. Call the Building Department (785-6261) to schedule an inspection at least one day prior to the inspection. The inspector will look for the following items during the inspection:
Note: No galvanized materials are to be used.
|
|
||||||||||||||||